| 41 & 42 Bridge Street |
1989
- 91
|
|
|
It was the success of the 3 Quay Walls project that involved the trust in
their next venture - the restoration of the two shops and flats at 41 &
42 Bridge Street. These two properties back onto the rear of 3 Quay Walls and were at the time of their acquisition - as all the previous projects in a perilous state which detracted from the work carried out by the trust. So these were purchased in 1989 and successfully restored with their original style shop fronts by 1991. |
||
![]() |
||